<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<title>John E. Green Company Petoskey MI - New Construction, Commercial Repair</title>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<link href="http://www.bayareaassn.com/baa.css" rel="stylesheet" type="text/css">
<meta name="keywords" content="new construction, commercial repair, radiant heating, mechanical construction, fire protection, sprinkler installation, radiant heating, radiant heating for the sidewalks, dynamite blasting, tradespeople, plumbing, HVAC, snow melt systems, skilled journeymen, Trane AHU, base mounted chilled water pumps, chilled water loop, Bay Harbor Marina District, Bay Harbor Marina District project, Clark Construction, JEG people, Fuller Nichols of Harbor Springs, Alpena General Hospital Radiology and Oncology Center, Jesse Besser Museum, Trane 140 ton chiller, Alpena General Hospital Radiology and Oncology Center">
<meta name="description" content="Examples of John E. Green's expertise in the plumbing and mechanical contracting business"
<style type="text/css">
<!--
H2.ParaHeader {
	font-size: 18pt;
	color: #006633;
}
-->
</style>
</head>

<body>
<table width="100%"  border="0" cellspacing="0" cellpadding="0">
  <tr>
    <td colspan="2"><span align="center"><img src="logo.gif" alt="John E. Creen Company Petoskey, MI" width="713" height="144"></span>
        <h2 class="ParaHeader" align="center">Marina District at Bay Harbor</h2></td>
  </tr>
  <tr>
    <td width="283" valign="top"><img src="marina-district.pg.jpg" alt="Marina District at Bay Harbor" width="270" height="202"></td>
    <td width="697"><p>&nbsp;</p>
      <p align="center"><a href="http://www.bayareaassn.com" style="font-family:arial;color:#0066CC"><strong>Return to Bay Area Association</strong></a></p>
      <p>For the showcase five-star Bay Harbor Marina District project,
      		John E. Green Company was engaged by Clark Construction to handle
      		the mechanical construction, fire protection and sprinkler installation
      		as well as the radiant heating for the sidewalks of this project
      		on the waterfront. <img src="building.jpg" alt="Marina District at Bay Harbor" width="166" height="85" hspace="15" vspace="15" align="right">Starting
      		with a lot of very hard soil that required dynamite blasting,
      		getting underground was difficult. With a maximum of 150 tradespeople
      		on site at peak times, the project involved some 20 full-time
      		JEG  people. Architects were Fuller 
      Nichols of Harbor Springs.</p>
      <p><br>
      <h2 class="ParaHeader">New Construction</h2>
        </font>Six journeymen worked on plumbing, HVAC and the snow melt<br>
         systems to the new addition of the Alpena General Hospital <br>
        Radiology and Oncology Center.</p>
      </td>
  </tr>
</table>

<table width="100%"  border="0" cellspacing="0" cellpadding="0">
  <tr>
    <td width="36%"><br>
<table width="100%"  border="1" cellpadding="5" cellspacing="0" bordercolor="#006633">
        <tr>
          <td><h2 class="ParaHeader">Commercial Repair</h2>
            <p><font color="#006633" size="+1"><img src="fountain.jpg" alt="" width="98" height="170" hspace="5" vspace="5" align="left"></font>The skilled journeymen from the John <br>
              E. Green Company, which donated the <br>
              pump and labor for the museum,<br>
               
              repaired the fountain which was not<br>
               working for the past two years.<font color="#006633"></font></p>
            <p align="right"><font color="#006633" size="+1"><img src="boiler.jpg" alt="Jesse Besser Museum Boiler Replacement" width="160" height="107" hspace="5" vspace="5"><br>
              </font>
            At the Jesse Besser Museum, <br>
              John E. 
              Green Company               replaced<br>
               the 2 boilers 
              in the mechanical room.<font color="#006633" size="+1"><br>
              </font></p></p></td>
        </tr>
      </table></td>
    <td width="32%" align="center" valign="middle"><img src="pumps.jpg" alt="Alpena General Hospital Chilled Water Pumps" width="209" height="137"><br>
      Shown are the base mounted chilled water pumps.
    </td>
    <td width="32%" valign="top"><p><img src="ahu.jpg" alt="Alpena General Hospital Trane AHU" width="133" height="202"></p>
      <p>Here is the 63,000 CFM Trane<br>
         AHU, 43' and 43,000 Ibs at the<br>
        cancer center's new addition to <br>
        the hospital- the radiology and <br>
        onocolgy center.<br>
      </p></td>
  </tr>
  <tr>
    <td>&nbsp;</td>
    <td valign="middle"><img src="chiller.jpg" alt="Alpena General Hospital Radiology and Oncology Center 140 ton Water Chiller" width="149" height="189" align="left">John E. Green Company installed 
      a Trane 140 ton chiller with a 6&quot; chilled water loop at the Alpena General Hospital Radiology and Oncology Center.<br></td>
    <td align="right" valign="bottom"><img src="map-top.gif" alt="State Coverage of Bay Area Association of Mechanical and Plumbing Contractors" width="128" height="126"></td>
  </tr>
  <tr align="center" bgcolor="#339966">
    <td colspan="3"><span
  class=GramE><strong><a href="http://www.bayareaassn.com" class="company" style="color:#333399;font-family:Arial Narrow">BAY AREA ASSOCIATION OF THE MICHIGAN
  PLUMBING AND MECHANICAL CONTRACTORS, INC.</a></strong></span></td>
  </tr>
  <tr>
    <td>&nbsp;</td>
    <td valign="middle"><div align="center"></div></td>
    <td align="right" valign="top"><img src="map-bottom.gif" alt=" " width="116" height="12"></td>
  </tr>
</table>
<script src="http://www.google-analytics.com/urchin.js" type="text/javascript">
</script>
<script type="text/javascript">
_uacct = "UA-1854072-1";
urchinTracker();
</script>
</body>
</html>

